"Created in 2004 to Provide Municipal Water"
South Alburgh Fire District No. 2
  • Home
  • About Us
    • SAFD2 History
  • Agendas and Minutes

Construction is Complete!

10/2/2014

0 Comments

 
Munson Earth Moving and Phelps Engineering notified us today that construction of Phase 1 on the SAFD2 water system, running from the Village to the golf course is complete!
0 Comments

Ready for Customers to Connect!

8/14/2014

 
We received notice this afternoon from Munson Earth Moving, our construction contractor, that the entire system has passed the bacteriological testing and is now officially ready for service to everyone!  For those of you who have signed up for service, here is some information about what you need to do to connect.
information_about_connecting_to_the_safd2_system_8.2014.pdf
File Size: 65 kb
File Type: pdf
Download File

safd2_plumbers_certification_for_cross_connection_control.pdf
File Size: 95 kb
File Type: pdf
Download File

Permit to Operate Received

7/29/2014

 
Another major step towards beginning operations and water flowing to customers happened today.  The State issued our permit to operate, which means we have been authorized to open for business once people are connected.
safd2_permit_to_operate_7.29.2014.pdf
File Size: 321 kb
File Type: pdf
Download File

More Water Line Being Tested

7/18/2014

 
Munson was testing the water line as far as Middle Road today.  Customers will soon begin receiving municipal water in their homes.
Picture

Posting of Notice of Ordinance Adoption

6/18/2014

 
The Notice of Ordinance Adoption has been posted as required in various places around the municipality, in The Islander and on this website.  The Certification of that posting is available below.
ordinance_certificate_of_posting_6.18.2014.pdf
File Size: 286 kb
File Type: pdf
Download File

Alburgh Village/SAFD2 Agreement

6/12/2014

 
In September 2012, SAFD2 and the Village signed an Interlocal Agreement which authorized SAFD2 to purchase its water from the Village.  Because SAFD2 is close to making water available to its customers, the Village Trustees and SAFD2 met on May 12, 2014 to flesh out the details of the financial and operating arrangement.  On June 2, 2014 they jointly reviewed the resulting Memorandum of Understanding (MOU) with both entities approving signature by their Chair once final comments were incorporated.  The MOU was signed on June 10, 2014 and is posted below, along with the 2012 Interlocal Agreement.  
av-safd2_mou_signed_6-10-14.pdf
File Size: 711 kb
File Type: pdf
Download File

av-safd2_interlocal_agreement_signed_09-17-12.pdf
File Size: 3543 kb
File Type: pdf
Download File

SAFD2 Annual Meeting Documents

6/10/2014

 
SAFD2 held its Annual Meeting on 6/9/14. At that time the Agenda, Chairman's Report, Treasurer's Report and 2014-2015 General Fund Budget were presented (documents below).  The budget was adopted. Other business was carried out according to the agenda and will be detailed in minutes to be posted on this website once approved by the Prudential Committee. 
2014_safd2_annual_meeting_agenda.pdf
File Size: 27 kb
File Type: pdf
Download File

chairmans_report_2014.pdf
File Size: 48 kb
File Type: pdf
Download File

safd2_treasurers_annual_report_presented_6.9.2014.pdf
File Size: 135 kb
File Type: pdf
Download File

approved_safd2_general_fund_budget_for_fy_ending_6.30.15.pdf
File Size: 25 kb
File Type: pdf
Download File

Ordinances Adopted

6/10/2014

 
At a SAFD2 Special Meeting held on 6/9/14 the Prudential Committee adopted an "Ordinance Relating to the Management, Operation and Protection of the South Alburgh Fire District No. 2 Public Water Supply System".  The signed Notice of Ordinance Adoption and Ordinance documents are posted below for public review. 
notice_of_ordinance_adoption_signed_6.9.2014.pdf
File Size: 46 kb
File Type: pdf
Download File

safd2_water_ordinance_adopted_as_amended_signed_6.9.2014.pdf
File Size: 313 kb
File Type: pdf
Download File

Posting for SAFD2 6/9/14 Special Meeting

6/4/2014

 
Here is the agenda for the 6/9/14 SAFD2 Special Meeting.
2014.06.09_safd2_special_meeting_agenda.pdf
File Size: 24 kb
File Type: pdf
Download File

First Water Flowing

5/19/2014

 
Picture
Munson is testing the first section of connected water main. Great to see water flowing!

<<Previous

    Author

    The SAFD2 Prudential Committee

    Archives

    October 2014
    August 2014
    July 2014
    June 2014
    May 2014
    April 2014
    January 2014
    December 2013
    October 2013

    Categories

    All

    RSS Feed

Proudly powered by Weebly